UTILITY OVERVIEW

Picture
Heavy power available to support manufacturing.
Picture
Located just three miles off I-75, with convenient truck access to local and regional markets from Chicago to Pittsburgh and Detroit to Cincinnati.
Picture
All utilities abailable​
Picture
Adjacent to CSX Transportation’s Northwest Ohio Intermodal Terminal, featuring coast to coast intermodal rail service and soon to be designated as an inland port
Picture
UTILITIES 
ELECTRICITY 
Available Megawatts (MW): 
12MW
Transmission Lines Voltage: 
138 kV
Substation Remaining Capacity: 
25 MW
Water: 
100,000 GPD (12" water main)
Sanitary: 
200,000 GPD (15" gravity sewer)
Gas: 
Service at site
FOR MORE INFORMATION
​Dan Wendorf
Sr. Managing Director, JLL
​+1 614 460 4407
[email protected]
Download Brochure
Picture
Although information has been obtained from sources deemed reliable, neither Owner nor JLL makes any guarantees, warranties or representations, express or implied, as to the completeness or accuracy as to the information contained herein. Any projections, opinions, assumptions or estimates used are for example only. There may be differences between projected and actual results, and those differences may be material. The Property may be withdrawn without notice. either Owner nor JLL accepts any liability for any loss or damage suffered by any party resulting from reliance on this information. If the recipient of this information has signed a confidentiality agreement regarding this matter, this information is subject to the terms of that agreement. ©2025. Jones Lang LaSalle IP, Inc. All rights reserved.